Wednesday, August 14, 2013

Start of painting

We have started painting and have the foundation coats on the cellar and living room walls as well as the door and window units done...at least for now.  I am sure that, after we load in and everything together, we will add more detail...
Over the next couple of days, Gary and I will add mildew, rust and water stains to the cellar walls and then some physical details like a rusty, leaky drain pipe, old light and wires, and a hand rail.  In the living room, we need to add vertical striping in the bead board wainscot and then dry brush over all of the butter color with white...the result will be a whitewashed finish.


The front door is done except to "frost out" the window so you don't see zombies and then add a roller shade or sheer curtain to catch light and show shadows of zombies outside the door...

More as the details get applied.

No comments:

Post a Comment